
Please Wait as the series of (4) animated
photos (to the right) load. They will take a few minutes.The photos are from Poured
Driveway to Landscaping.
Follow the construction of this home by clicking below on a phase you would like to see.
1) From lot site to stemwall.
2) CBS Walls to Tie Beam.
3) From Roof to Driveway Forming
4) From Poured Driveway to Landscaping
5) From Frame Walls to Finished Drywall
6) From Tile Floors to Masterbath
7) Construction of Pool