3.gif (245858 bytes)

semanim.gif (1778 bytes)Please Wait as the series of (4) animated photos (to the right) load. They will take a few minutes.The photos are from Roof to Driveway Forming .

Follow the construction of  this home by clicking below on a phase you would like to see.

1) From lot site to stemwall.
2) CBS Walls to Tie Beam.
3) From Roof to Driveway Forming
4) From Poured Driveway to Landscaping
5) From Frame Walls to Finished Drywall
6) From Tile Floors to Masterbath
7) Construction of Pool

Back to Main Page